PDA

View Full Version : RV Quick Build build times...


December 17th 03, 01:33 AM
I've had my eye on the RV aircraft for a very long time.

Anyone on this list finish a quick built RV?

How long did it take?

How much longer do you think the RV-10 QB will take when it's availible?

(More seats more interior, bigger, it should take take somewhat longer.)


I've got my A+P ticket, and I've done a lot of sheet metal, but that was 25years ago and I've done none since.


Paul

Charlie England
December 17th 03, 03:14 AM
wrote:
> I've had my eye on the RV aircraft for a very long time.
>
> Anyone on this list finish a quick built RV?
>
> How long did it take?
>
> How much longer do you think the RV-10 QB will take when it's availible?
>
> (More seats more interior, bigger, it should take take somewhat longer.)
>
>
> I've got my A+P ticket, and I've done a lot of sheet metal, but that was 25years ago and I've done none since.
>
>
> Paul
>
>
Try the Matronics RV-list. Around 2000 members.

-= List Related Information
_-= Post Message:
_-= UN/SUBSCRIBE: http://www.matronics.com/subscription
_-= List FAQ: http://www.matronics.com/FAQ/RV-List.htm
_-= Search Engine: http://www.matronics.com/search
_-= 7-Day Browse: http://www.matronics.com/browse/rv-list
_-= Browse Digests: http://www.matronics.com/digest/rv-list
_-= Live List Chat: http://www.matronics.com/chat
_-= Archives: http://www.matronics.com/archives
_-= Photo Share: http://www.matronics.com/photoshare
_-= List Specific: http://www.matronics.com/rv-list
_-= Other Lists: http://www.matronics.com/emaillists
_-= Trouble Report http://www.matronics.com/trouble-report
_-= Contributions: http://www.matronics.com/contribution

Orval Fairbairn
December 17th 03, 03:29 AM
In article >,
wrote:

> I've had my eye on the RV aircraft for a very long time.
>
> Anyone on this list finish a quick built RV?
>
> How long did it take?
>
> How much longer do you think the RV-10 QB will take when it's availible?
>
> (More seats more interior, bigger, it should take take somewhat longer.)
>
>
> I've got my A+P ticket, and I've done a lot of sheet metal, but that was
> 25years ago and I've done none since.
>
>
> Paul
>
>

I have several friends who built both quick build and slow build RV-8s.
One of the slow builds got finished within a couple of months of the
first quick build.

Both kits are very high quality -- the workmanship on the QB kits is
first class. Figure on at least three years to build one.

Google