November 22nd 16, 09:18 PM
It looks like I'll finish this batch a bit ahead of schedule. If I can finish making and adding the shank fittings this weekend I will start mailing them out Monday 28 November.
It also looks like I might have one left over--when I make parts like this I always kit out one or two extra assemblies in case I mess up one of the fabrication steps. But at this point I have plus one wands and plus two each 6mm and 8mm shanks. So I'll probably put the extra up on eBay and see what the market bears.
--Bob K.
It also looks like I might have one left over--when I make parts like this I always kit out one or two extra assemblies in case I mess up one of the fabrication steps. But at this point I have plus one wands and plus two each 6mm and 8mm shanks. So I'll probably put the extra up on eBay and see what the market bears.
--Bob K.