View Single Post
  #7  
Old July 22nd 05, 03:18 AM
JPH
external usenet poster
 
Posts: n/a
Default

Peter R. wrote:

If you provide the airport ID, I can check to see if anything has been
started.


Thanks for the reply and the links! The airport is 4G2, which is
Hamburg Airport (Hamburg, NY).



I didn't find anything in the procedure system regarding new/proposed
procedures for this airport (K4G2). Could have something to do with the
2,465 runway length, since normally 3,200 is required (although
exceptions can be made). Best way to find out would be to contact the
FPO (Flight procedures Office) directly to ask about what needs to be
done to get the airport IFR certified and have a procedure built.

The New York Flight Procedures Office
FAA/AEA/NYC FPO
1 Aviation Plaza
Room 126
Jamaica, NY 11434
Thomas L. Lattimer
E-mail:
Office: (718) 977-6533
Fax: (718) 977-6735

Or, you could use the following link to request a procedure on-line.
http://avn.faa.gov/index.asp?xml=ifp/ifpform

JPH