View Single Post
  #3  
Old August 24th 04, 05:02 AM
john smith
external usenet poster
 
Posts: n/a
Default

Roy Smith wrote:
I was in Claremont NH (KCNH) today. The DP reads (per a recent FDC
notam; it's different from what's published):

DEPARTURE PROCEDU
RWY 11: CLIMB VIA HEADING 109 TO 2500 THEN CLIMBING RIGHT
TURN DIRECT CNH NDB, CLIMB IN HOLDING TO 3000 BEFORE
PROCEEDING ON COURSE.
RWY 29: CLIMB VIA HEADING 289 TO 2500 THEN CLIMBING LEFT TURN
DIRECT CNH NDB, CLIMB IN HOLDING TO 3000 BEFORE PROCEEDING ON
COURSE.

What's strange is the climb in the holding pattern. The airport
elevation is 545. You climb about 2000 feet on runway heading, then
turn around and head back to the airport while still climbing. I'm
having a hard time envisioning any scenario where you would get back to
CNH NDB (which is on the field) and not be at 3000 yet.
Is there something I'm missing?


This from the newly issued INSTRUMENT PROCEDURES HANDBOOK (FAA-H-8261-1)
Page 2-32...

VFR DEPARTURE
There may be times when you need to fly an IFR flight plan due to the
weather you will encounter at a later time (or if you simply wish to fly
IFR to remain proficient), but the weather outside is clearly VFR. It
may be that you can depart VFR, but you need to get an IFR clearance
shortly after departing the airport. A VFR departure can be used as a
tool that allows you to get off the ground without having to wait for a
time slot in the IFR system, however, departing VFR with the intent of
receiving and IFR clearance in the air can also present serious hazards
worth considering.
A VFR departure dramatically changes the takeoff responsibilities for
you and for ATC. Upon receiving clearance for a VFR departure, you are
cleared to depart; however, you must maintain separation between
yourself and other traffic. You are responsible for maintaining terrain
and obstruction clearance as well as remaining in VFR weather
conditions. You cannot fly in IMC without first receiving your IFR
clearance. Likewise, a VFR departure relieves ATC of these duties, and
basically requires them only to provide you with safety alerts as
workload permits.
Maintain VFR until you have obtained your IFR clearance and have ATC
approval to proceed on course in accordance with your clearance. If you
accept this clearance and are below the minimum IFR altitude for
operations in the area, you accept responsibiility for
terrain/obstruction clearance until you reach that altitude.