On Tue, 09 Nov 2004 17:14:45 -0500, Dave Butler
wrote:
Perhaps the question you intended to ask is: "am I required to do a procedure
turn at RAINEE?" A hold is never required there unless so instructed by ATC.
Not so. If you arrive via the transition from CLL, a procedure turn is
required.
--ron
|