View Single Post
  #5  
Old August 18th 07, 01:45 PM posted to rec.aviation.piloting
Neil Gould
external usenet poster
 
Posts: 723
Default Columbia Aircraf: 300 Worker Lay Off Due To Garmin G1000 Issues

Recently, Dan Luke posted:

"Neil Gould" wrote:


Sounds to me like a component issue rather than a design issue


Yep. The nightmare of all mfrs that pull components from all over
the world into a complex, integrated product.

As a G1000 owner, I know I own a perishable system. How long before
the unavailability of a critical component makes it unmaintainable?

Since the G1000 system is modular, a different configuration of components
could be made functionally equivalent or superior to the current design of
any of its modules, so it should be able to be maintained indefinitely.
This doesn't follow the computer-oriented model of selling system
"upgrades", but that is a different matter.

Neil