FLARM UPDATE?
			 
			 
			
		
		
		
		
I think these dates are going to be "best case", at least for the 
Brick. 
 
I'd think that we would have seen by now a more detailled spec on how 
this brick will look like if the design was mature. Manufacturing 
leadtime for this type of equipment is typically 8-10 weeks for 
production quantities. To ship by June, this means that PowerFlarm 
team should have a frozen design mid April. This is 4 weeks away hence 
my doubts. 
 
I am hoping that my PowerFlarm brick will be filed in June but I would 
not be surprised if I am still waiting for it in August (along with 
the NK Vario). 
 
		
	
		
		
		
		
		
	
		 
		
	
	
	 |