Thread: Major Overhaul
View Single Post
  #10  
Old June 8th 04, 11:19 AM
JohnN3TWN
external usenet poster
 
Posts: n/a
Default

That is ONLY for a certified repair station (part 145)

But, if I read it correctly, paragraph (b) tells that the form is not
needed if the repairs are made IAW manual or specs acceptable to the
administrator. Presumably, the overhaul manual is a manul or spec
acceptable to the admin?