View Single Post
  #63  
Old June 25th 08, 11:05 PM posted to rec.aviation.piloting,rec.aviation.homebuilt
[email protected]
external usenet poster
 
Posts: 2,892
Default How Beat The High Cost Of Fuel: The ElectraFlyer-C

In rec.aviation.piloting Bob Kuykendall wrote:
On Jun 24, 9:45?am, Jim Pennino wrote:


I'm aware of ITER and the fact that *IF* ITER is a success, you can
expect an operational fusion power plant no earlier than 2040, by
which time a good percentage of current posters, including myself,
will be long dead.


I don't see why the long time until payback is an issue. My attitude
is that we've already squandered enough of our grandkids' resources,
the very least we can do is throw them a bone. Comparing the risk/
benefit ratio of ITER with that of other current nonsense like the war
in Iraq, it seems like a no-brainer to me.


The long lead time isn't an issue, it is reality.

Fusion holds the promise of solving a huge percentage of the worlds
energy problems if it can be make to work.

The reality is it will not be before 2040 that the first one goes
into operation, and only then if ITER is a success.

And even if ITER doesn't meet full success, the lessons of its failure
will drive all sorts of different technology innovations.


It is more likely it will drive ITER-B.


--
Jim Pennino

Remove .spam.sux to reply.