![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]()
I'm considering buying one, wondering what I should plan for an engine
overhaul hourly reserve. TTE unknown, no logs, the plane is still flying off its phase 1 hours, about 10 STOH (unknown quality). I'm told by the builder/seller that it's an L2C model, but a fellow looked at the pictures and thought it was a B or C model rather than L, said those were frightfully more money to overhaul. Compressions are all mid to high 70's. I'm thinking $15/hr s/b a safe assumption? |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
V-8 powered Seabee | Corky Scott | Home Built | 212 | October 2nd 04 11:45 PM |
Ultralight Club Bylaws - Warning Long Post | MrHabilis | Home Built | 0 | June 11th 04 05:07 PM |
Flight test update - long | nauga | Home Built | 1 | June 5th 04 03:09 AM |
SWRFI Pirep.. (long) | Dave S | Home Built | 20 | May 21st 04 03:02 PM |
Powered Parachute Plans- correction | Cy Galley | Home Built | 0 | July 11th 03 03:43 AM |