![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]()
I fly from KLAX to KLAS, using the FMC to handle most of the flight.
With the routing I put in, the FMC decides on some default altitudes and includes required altitudes for the arrival and departure procedures I select. Part of what it does is to create a descent schedule from the nominal cruise altitude to the arrival procedure. So I leave KLAX and my last explicit instruction from ATC is "climb and maintain FL290," which is my programmed and filed cruise altitude. Now, my question is this: If the FMC has a programmed descent in its route, do I let the FMC start the descent where it sees fit, or do I force the aircraft to maintain FL290 until ATC explicitly clears me for my own navigation or for a lower altitude? And if ATC's last instruction had simply been "resume own navigation" or "proceed as filed," would that mean that I'd be free to begin the descent whenever the FMC (or I) decides it's best? In situations where I can begin the descent at my discretion (assuming that own navigation implies this), should I tell ATC that I'm leaving my cruise altitude? If the FMC has a continuously changing estimate of lower altitudes in the descent profile, what should I give as my target altitude? The next fix that has a specific altitude? (Such as a fix in the arrival procedure) Climbing I think I understand. If I'm told to resume own navigation, or cleared as filed in the first place, I climb per my flight plan/FMC profile. If ATC says maintain X, I stay at X until ATC tells me to resume own navigation or instructs me to change altitudes. But the descent part still has me a bit confused. -- Transpose mxsmanic and gmail to reach me by e-mail. |
Thread Tools | |
Display Modes | |
|
|