![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#21
|
|||
|
|||
![]()
Matt Whiting wrote:
Even so, there is no reason this can't be done in stages that would prevent having to have everyone locked out for 2 months. A smart contractor would do this in stages anyway so that all of his personell can be working at the same time - demolition, debris removal, adding the new gravel and paving. If he does all of the demolition, and then all of the debris hauling, and then adds all of the gravel, and then does all of the paving last, that is just very poor construction management and utilization of equipment and personnel. If they run all of these concurrently in close sequence, then they should be able to pass each hangar in a couple weeks or less and allow the other hangars to remain in use. You're absolutely correct, and I suggested that to the Director of Public Works. Currently they're just using two massive phases. The first phase *is* the two month phase. I suggested that they break it into 5 or 6 smaller phases, and he basically told me "the phasing is written into the contract, and what it is is what it is. We're not changing it at this stage". Subsequent e-mails between him, myself and the airport manager have seemingly "softened" that stance. As I said, we'll see... --- Jay -- Jay Masino "Home is where My critters are" http://www.JayMasino.com http://www.OceanCityAirport.com http://www.oc-Adolfos.com |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
for the hangar queens | [email protected] | Soaring | 15 | December 8th 06 03:16 AM |
t-hangar and ice | Bob Noel | Owning | 13 | October 19th 04 09:59 PM |
Hangar at FFZ | [email protected] | Aviation Marketplace | 1 | August 18th 04 09:40 PM |
FFZ Hangar | [email protected] | Aerobatics | 0 | August 16th 04 12:55 AM |
Hangar Space Available at 47N | john price | Piloting | 0 | December 11th 03 12:12 PM |