If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
![]()
Inside the Navy - 2/22/2010
Navy doesnıt expect schedule delay Official: Navy JSF Variant To Go Offline For A Month For Design Fixes The Navyıs F-35 Joint Strike Fighter carrier variant will be taken offline "for about a month" to put design fixes in after problems with load transfers during launch were discovered last year, but it will not delay the aircraft's schedule, according to Capt. Lawrence Burt, commander of Carrier Air Wing Two. Lockheed has been fixing a structural weakness in the variant that limits the aircraftıs launching ability since the problem was discovered in July. Burt told attendees at a conference in Washington February 18 that the Navy has settled on a fix that will not delay the aircraft reaching initial operational capability in 2014. "It was just the way the load transfers from the launch,² he said. "Theyıve got a fix for it. Right now, theyıre trying to figure out the plan on modding whatıs already in the production line -- the SDD [system development and demonstration] articles that are going through production."Right now, the Navy is not concerned," he added. "The fix looks very doable, and I think itıll take the aircraft offline for about a month to put the mod in." Burt said that this type of problem "is not unusual when youıre at this stage of the development in an aircraft." "Theyıve only got one CV variant thatıs through the production line at this point, so thereıs going to be lots of discovery as they go through test on things that have to get fixed," he said. The first CV variant test aircraft, CF-1, is scheduled to begin test flights in the spring. The JSF program has been pressured to start accumulating test data from all three variants as Congress becomes increasingly concerned about the cost increases and delays that have been rampant in the program. |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
FAA NOTAM System Offline | Jim Logajan | Piloting | 15 | May 25th 08 06:06 PM |
FAA NOTAM System Offline | Jim Logajan | Soaring | 4 | May 24th 08 02:32 AM |
Bad Month for Flying | Jay Honeck | Piloting | 15 | December 25th 07 05:52 PM |
Offline way to find Wifi Hotspots for Internet access | Riverwalk Mobile | Piloting | 0 | August 11th 04 11:42 PM |
Standard Cirrus web site temporarily offline | Jim Hendrix | Soaring | 1 | January 21st 04 07:09 PM |