![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#11
|
|||
|
|||
![]()
El lunes, 8 de abril de 2019, 21:43:09 (UTC-3), tienshanman escribió:
Emir Sherbi;986843 Wrote: El lunes, 8 de abril de 2019, 0:19:32 (UTC-3), Roy E escribió:- Emir, What is the prop diameter? What is the weight of the complete motor assembly? What are the dimensions of the space, which this assembly occupies when retracted? Thanks, Roy- Roy, 1m Prop diameter. Total weight for the self launching configuration is near and below 55kg. Including the structural reinforcement. The motor bay is 1m long, 0,24m width, 0,35m tall at front, 0,25m at the back. What gliders can this be built into and how would the process work? Where would installation take place? -- tienshanman Without much redesign, gliders that originally have water ballast bags. If you have "wet wings" we have to search a place on the fuselage for the battery packs. That means that ASW19/20 - Pegasus - LS1/3/4 and others can be modified without much redesign. The modification would take place in the US. Depending on the orders and the locations of the gliders. |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Electric Self Launch System | Emir Sherbi | Soaring | 31 | October 28th 18 04:53 AM |
Electric Self Launching System | Emir Sherbi | Soaring | 0 | June 4th 18 04:54 PM |
FES&electric system batteries | krasw | Soaring | 33 | February 25th 17 04:17 PM |
ASW24 - electric valve system | Norbert Gulczynski | Soaring | 1 | January 25th 15 01:13 PM |
Relief System Update | [email protected] | Soaring | 4 | March 16th 07 03:49 AM |