![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#11
|
|||
|
|||
![]() Mike - Obviously you have a lot of experience that yet may make you change your mind a little the first time you encounter a stripped drain plug (who in hell put in that rubber plug?) in that Audi! NRP Actually, I still do change the oil in all the infernal combustion engines I own. I have heard so many horror stories about the local oil monkeys I am afraid to take any of the cars to them. I do the airplane because it gives me an excuse to poke around under the cowling and look for anything that may be amiss. Oh yeah, I own the "House from Hell". The former hillbillies who lived here did everything on the cheap with "Bubba the carpenter". So, I do get mired in goofy projects that go wrong because the last idiot did it the "easy way". The roof "repairs" they did damaged over 80 sheets of decking. I let the roofing pros rip off, resheet, and replace the entire thing (Bye Bye $18 grand). The thought of 3400 square feet of exposed roof (and hauling 120 pound rolls of torch down roofing up there) was enough to make me throw in the towel right away. I knew I had done the right thing when they hauled away the SECOND 40 foot dumpster filled to the top with the old tar and gravel. It took 5 24 year olds over 5 days to do it. Yikes! Probably would have killed me. Fun stuff, Mike |
#12
|
|||
|
|||
![]()
Oh yeah, I own the "House from Hell". The former hillbillies who lived
here did everything on the cheap with "Bubba the carpenter". Sounds like the hotel. We have spent five years remodeling two 3-story buildings. Mary and I do most of the work ourselves (I'm a much better carpenter than I am A&P!), but we're smart enough to farm out stuff like plumbing, roofing, and (most of all) drywall. I HATE drywall. I have discovered so many slip-shod, cheapest-possible modifications and repairs over the years, it's hard to imagine. I'd be willing to bet that 40% of the work we've done has been directly related to repairing stuff that was screwed up by previous carpenters/workers/ plumbers/electricians... -- Jay Honeck Iowa City, IA Pathfinder N56993 www.AlexisParkInn.com "Your Aviation Destination" |
#13
|
|||
|
|||
![]() Mike Spera wrote: Oh yeah, I own the "House from Hell". The former hillbillies who lived here did everything on the cheap with "Bubba the carpenter". I can sympathize with you Mike. I've also got a HFH....got 99% of the way through a remodel that took 5 different contractors 16 months to get to the point that I tossed them all off the job. Worked for about four months cleaning up their screwups and poor workmanship and the huge punchlist, all to have it flood a month later. Now we are tearing it all out and getting ready to completely gut the place to fix all the "Bubba fixes" so that I can sell it and get us into a better situation. Probably the funniest of the "Bubba fixes" was from when the house was built. Two sinks 3 feet apart in the big bath.....had at least 30 elbows and a dozen couplings for the water lines between them. Total piping run for both hot and cold was about 7 feet. Looks like they built that and other things from the job junkbox. Too cheap to buy the correct materials, and way too cheap to have the work done correctly. I figure it will take me probably six months to redo everything after I gut the place, just so we can sell it. Craig C. |
#14
|
|||
|
|||
![]()
Jay Honeck wrote:
Yep, pretty much everything takes twice as long as I expect, even when I expect it to take twice as long as I expected.... You're talking to the guy who has yet to complete his three-year hotel remodeling plan. We celebrated our fifth anniversary in August... Ok, many years ago I figured I could remodel the bathroom in the week between Christmas and New Year's (when I was a teacher and had the week off). So, the day after Christmas I walk into the bathroom with an air chisel and remove walls, ceiling, floor. I took it all down to the studs. Anyone want to guess how long it was before it was finished? Margy ;-) -- Jay Honeck Iowa City, IA Pathfinder N56993 www.AlexisParkInn.com "Your Aviation Destination" |
#15
|
|||
|
|||
![]()
If you would give us the year that you started I could probably guess the
year it was done. Plus or minus a year or so. {;-) Jim -- "If you think you can, or think you can't, you're right." --Henry Ford "Margy Natalie" wrote in message m... Jay Honeck wrote: Yep, pretty much everything takes twice as long as I expect, even when I expect it to take twice as long as I expected.... You're talking to the guy who has yet to complete his three-year hotel remodeling plan. We celebrated our fifth anniversary in August... Ok, many years ago I figured I could remodel the bathroom in the week between Christmas and New Year's (when I was a teacher and had the week off). So, the day after Christmas I walk into the bathroom with an air chisel and remove walls, ceiling, floor. I took it all down to the studs. Anyone want to guess how long it was before it was finished? Margy ;-) -- Jay Honeck Iowa City, IA Pathfinder N56993 www.AlexisParkInn.com "Your Aviation Destination" |
#16
|
|||
|
|||
![]()
Margy Natalie wrote:
Anyone want to guess how long it was before it was finished? Is it finished yet? ;-) |
#17
|
|||
|
|||
![]()
Great story, Jay!
"Jay Honeck" wrote in message oups.com... http://www.alexisparkinn.com/avtek_p...stallation.htm :-) -- Jay Honeck Iowa City, IA Pathfinder N56993 www.AlexisParkInn.com "Your Aviation Destination" |
#18
|
|||
|
|||
![]()
Mike Spera wrote:
... Probably the funniest of the "Bubba fixes" was from when the house was built. Two sinks 3 feet apart in the big bath..... had at least 30 elbows and a dozen couplings for the water lines between them. Total piping run for both hot and cold was about 7 feet. Got a photo of that? I'd love to see it. |
#19
|
|||
|
|||
![]()
O.K. I have a good one. The doorbell mounted high on a soffit overhead
in the kitchen. What could they POSSIBLY screw up? When I tore down the drywall (ALL 4 LAYERS - the DIP****S just kept piling it on for the backsplash) I found the wiring for the doorbell. It was an old 110v system. They used zip cord (brown 18 gauge lamp cord) STAPLED TO THE 2X4 stud. It was wired into one of the legs to the electric stove. Big lug with electrical tape around it. This was on a 50 amp circuit breaker. Remember that lamp cord is rated for 8 amps or so. I found the doorbell shorted, the zipcord completely devoid of the insulation because the short had cooked it off, and the remaining strands of wire burned/buried into the scorched and blackened 2X4. I have no idea how this did not start a fire. I also found a "new" outlet some bubba installed. 2 pieces of insulated wire strung between the drywall and studs, around and inside corner to the new outlet. Real nice. Finally the topper. They turned the former laundry room into a bathroom, complete with shower. For an exhaust fan, they plastered in the wrong sized unit into a big hole high up on a wall (2+ inches of plaster oozing out the back). Now, the $6000 punchline. Since it was too much trouble to run the vent hose properly (through a roof vent), they simply left it hanging IN THE DROP CEILING COLD AIR RETURN. The warm wet air from the bathroom was being pumped into this drop ceiling where it went straight into the roof insulation and finally the roof decking. 80+ sheets of rotted decking (an additional $6k for the roof) because Bubba Jackass did not have the brains to know that you NEVER run a bathroom vent ANYWHERE but out of the house, preferably out the roof. What have you guys seen? Don't limit this to your house, this is an aviation group. I'm sure we have some real winners in the airplane category... Can't wait Mike |
#20
|
|||
|
|||
![]() Wish I did Jon. At the time I was putting in 12+ hours a day at work besides the 2.5 hours of commute time, and at the same time staying one step ahead of the EMT's and going to the hospital. I had about 10 minuets of coherent time a day with the contractor. Craig C. |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
The Good, the Bad, the Ugly: AirGizmo PIREP, PS Engineering CD/Intercom woes, XM "service" | Jay Honeck | Owning | 34 | December 15th 06 03:02 AM |
Old polish aircraft TS-8 "Bies" ("Bogy") - for sale | >pk | Aviation Marketplace | 0 | October 16th 06 07:48 AM |