If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
cylinder replacement
Hi,
I've owned my airplane, a '69 piper Cherokee, for about 5 years now, and it's finally time that one "annual from hell" that happens to everyone at some point or another to hit. The engine is a lycoming O-360 and currently has around 850 SMOH. It's been overhauled once in it's lifetime. It started with some aluminum shavings which led us to suspect bad piston pin plugs. My A&P pulled the cylinders, found that the piston pin plugs were indeed bad, and sent the cylinders to a cylinder shop for evaluation. Unfortunately, the shop has found that one cylinder had a cracked exhaust port and is unservicable. It needs to be replaced. I'm still waiting to hear on the other three, but at minimum they need to be rechromed and possibly some repair work as well. My A&P says that the lower half of the engine is in excellent condition, so there is no need for a full overhaul. This leaves me with three options: A) Replace all four cylinders with new at a cost of $1500 each. Times four that is $6000. B) Replace all four cylinders with "used" (reconditioned?) at a cost of $900 each. Total of $3700. C) Replace only the bad one and get the three remaining good ones rechromed and/or repaired. I don't know what the rechroming/repair fee will be on the other three yet, so that option is unknown. I'm supposed to hear back from the shop by tomorrow with an estimate. Of course, added to these costs are whatever labor and parts my A&P has accumulated during the annual, the labor to put the replacement cylinders back on, torque everything down, etc. Generally the rest of the annual went very well (which is the sole bit of good news). Anyway, my question to the other airplane owners out there -- which of the three options A, B, or C would you choose? In generally, my philosophy has been to avoid using "used" parts when at all possible, but of course these are very expensive parts. Unfortunately I have no budget saved up for this, so cost is a major factor to me. I'm probably looking at owning the airplane for another 400-500 hours maximum. Thus when I go to sell, the ad would read something like "1250 SMOH 400 STOH". Is the top-overhaul a selling point? Is the buyer going to care significantly whether I use new cylinders or used/reconditioned? Thanks! ----------------------------------------------------------- Posted using Android Newsgroup Downloader: .... http://www.sb-software.com/android ----------------------------------------------------------- |
Thread Tools | |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Bad cylinder | Denny | Owning | 17 | September 12th 05 06:04 PM |
Path of an airplane in a 1G roll | Chris W | Piloting | 47 | July 4th 05 10:53 PM |
Path of an airplane in a 1G roll | Chris W | Aerobatics | 20 | June 29th 05 09:35 AM |
Path of an airplane in a 1G roll | Chris W | Home Built | 22 | June 29th 05 09:35 AM |
Start Anywhere Cylinder (SSA rules proposal) | Mark Navarre | Soaring | 15 | September 25th 03 01:13 PM |