A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » Aviation Images » Aviation Photos
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

This $750K 'Ferrari of Snowplows' Clears an Airport Runway In Just 15 Minutes - $750K 'Ferrari of Snowplows' 2.jpg ...



 
 
Thread Tools Display Modes
  #1  
Old December 27th 19, 04:55 AM posted to alt.binaries.pictures.aviation
Miloch
external usenet poster
 
Posts: 24,291
Default This $750K 'Ferrari of Snowplows' Clears an Airport Runway In Just 15 Minutes - $750K 'Ferrari of Snowplows' 2.jpg ...

more at
http://www.msn.com/en-us/autos/enthu...5DP?li=BBnbfcL

https://youtu.be/Q7SFPi0tCKA

It used to take the Indianapolis International Airport around 45 minutes just to
clear one runway of snow. That wasn't cutting it, so the airport went bigger and
cut down its plow time to just a third of what it was. How'd it do that?

Meet the insanely huge MB5. Indianapolis Airport Authority Executive Director
Mario Rodriguez described these as the "Ferrari of Snowplows" to the
Indianapolis Star, with each plow costing $750,000.

With these, the Indy Star says it takes as little as 15 minutes to clear a
runway, drastically reducing the airport's downtime during the busy holiday
season. Local station RTV6 reported that it can take around 30 minutes to finish
up, but still, that's a huge improvement that Director of Operations and
Maintenance Matt Lewis describes as "night and day" over the old snow removal
procedure.

Previously, the airport relied on dump trucks with plow attachments, but they
simply weren't up to snuff. Indianapolis' longest runway is 11,200 feet long and
the city gets an average of 25 inches of snow per year, per RTV6.

The MB5, on the other hand, is purpose-built to get snow out of the way. It
features a 24-foot-wide plow up front as well as a 22-foot-wide broom on the
back. Two fuel tanks that hold a combined 75 gallons of diesel feed the two
engines that power these beasts.

Airports are prohibited from using salt on runways by the Federal Aviation
Administration, so the MB5 also has a dry chemical spiller on the back.

"If we could use salt, our lives would be much easier," Senior Director of
Airport Operations and Public Safety Keith Berlen told the Indianapolis Star.
"But it doesn't mix with aircraft."

To that, I've got to say, "hard no." I've seen the structurally questionable
cars up near salt-happy Buffalo and have to side with the FAA on this. I don't
want to have an airport delay so some poor mechanic can patch an armadillo-sized
rust hole in the side of the plane. But I digress.

The airport started using the MB5 plows in 2013, when an order of nine plows
made weathering harsh winters far easier, as they soon found out. The
Indianapolis Star writes:

The airport purchased nine of the giant snowplows -- called MB5s -- in 2013,
said Matt Lewis, the airport's director of operations and maintenance. Each plow
costs $750,000, Rodriguez told IndyStar.

Coincidentally, that winter was rough. It snowed nearly nine inches in December
2013, a whopping 27 inches in January 2014 and more than 16 inches in February
2014, according to National Weather Service data.

"We really lucked out that way," Lewis said.
Indianapolis International Airport's MB5 fleet has since grown to 11 plows. They
have to train workers how to use them ahead of Indy's snow season, with plows
forming a diagonal line as they move down a runway to clear it as soon as
possible.

Wind determines the direction the plows line up, as the plows would rather work
with the wind to let it help blow more snow out of the way.

The plow fleet has outgrown its old hangar at the airport, so the Indianapolis
International Airport is constructing a new $9.7 million snow removal equipment
building, the Indianapolis Star reports. It is set to open before next winter.


*

 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
750K ... One Turn Papa3[_2_] Soaring 0 October 19th 12 04:00 AM
New Ulm, MN (ULM) Airport Runway Extension Study Dan Hoehn General Aviation 1 May 5th 04 03:33 PM
CBS quote: plane on the runway at a Florida airport??? Max T, CFI Piloting 1 January 15th 04 07:15 PM
Typhoon vs. Ferrari. . . Scott Ferrin Military Aviation 23 December 13th 03 01:54 AM
Delore-Fossett new 750k triangle record Stewart Kissel Soaring 1 July 31st 03 12:29 PM


All times are GMT +1. The time now is 06:27 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 AviationBanter.
The comments are property of their posters.