![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#11
|
|||
|
|||
![]() "Mike Granby" wrote in message ... Is that so unusual? The ILS into CXY used to have ADF REQUIRED on the plate, even though you could easily fly it without such equipment if receiving radar vectors. (The plate now says ADF or RADAR, but was only changed recently.) This plate does not say "DME REQUIRED". |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
The perfect approach | Capt.Doug | Home Built | 25 | December 3rd 04 03:37 AM |
Established on the approach - Checkride question | endre | Instrument Flight Rules | 59 | October 6th 03 04:36 PM |
Terminology of New WAAS, VNAV, LPV approach types | Tarver Engineering | Instrument Flight Rules | 2 | August 5th 03 03:50 AM |
IR checkride story! | Guy Elden Jr. | Instrument Flight Rules | 16 | August 1st 03 09:03 PM |
CAT II Minimums on a CAT I Approach | Giwi | Instrument Flight Rules | 11 | July 24th 03 07:46 AM |