![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
![]() "Ben Smith" wrote in message ... Thought I'd make a quick post about our annual this year. Came in just over $1k, for the normal inspection, plus: New EGT probe (EGT was inop) New Brackett air filter housing. (Due to AD?) ELT Battery Gaskets... #1, #2, & #3 valve covers, dipstick tube, both mags, and pushrod tubes on #1. New Voltage Regulator. (we had intermittant charging problems) 'Installed' autogas STC, filed paperwork, etc. About 16.5 hours of labor all together. Another lucky year! 16.5 hours for a thorough inspection with all the manufacturer's checklist items completed? |
#2
|
|||
|
|||
![]()
Yes, the airframe and engine logbooks state that approved checklists were
used. Why, is 16.5 not enough time for a 172? "Jim Vadek" wrote 16.5 hours for a thorough inspection with all the manufacturer's checklist items completed? |
#3
|
|||
|
|||
![]() "Ben Smith" wrote in message ... Yes, the airframe and engine logbooks state that approved checklists were used. Why, is 16.5 not enough time for a 172? "Jim Vadek" wrote 16.5 hours for a thorough inspection with all the manufacturer's checklist items completed? I created the wrong impression, sorry. That is good time for an annual and the reason I asked the question is that mine runs about 25 hours with preventative stuff thrown in. |
#4
|
|||
|
|||
![]()
Most A&Ps I know would say that 16.5 hours is enough to do the job. Sounds
like you had a pretty good year. I find that I am always fixing something during the year in addition to whatever is done during the annual. Sometime I will have to go through all the logs and figure out what the real annualized costs are for my maintenance. The result would of course fall under the rules of "double secret probation" and not be shared with the wife : -) "Ben Smith" wrote in message ... Yes, the airframe and engine logbooks state that approved checklists were used. Why, is 16.5 not enough time for a 172? "Jim Vadek" wrote 16.5 hours for a thorough inspection with all the manufacturer's checklist items completed? |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
American nazi pond scum, version two | bushite kills bushite | Naval Aviation | 0 | December 21st 04 10:46 PM |
Free Volksplane to good home, located in Chino Hills CA | Bryan Zinn | Home Built | 3 | July 18th 04 02:55 AM |
bush rules! | Be Kind | Military Aviation | 53 | February 14th 04 04:26 PM |
bulding a kitplane maybe Van's RV9A --- a good idea ????? | Flightdeck | Home Built | 10 | September 9th 03 07:20 PM |
It's that time of year again. | Capt. Doug | Home Built | 19 | September 3rd 03 10:53 PM |