A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Piloting
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

in search of J.C. Kamienski



 
 
Thread Tools Display Modes
  #1  
Old December 2nd 03, 03:08 AM
Chip Jones
external usenet poster
 
Posts: n/a
Default


"Jill Kamienski" wrote in message
om...
Chip,
First it was just waiting on other trainees, but now we're putting
URET in, so they say they don't have the staffing and equipment to
continue D-side training while doing URET training.


LOL, URET eh? Wow! We were supposed to put URET in a couple of years ago
here at ZTL. We didn't have enough controllers to both train on URET and
also run the day to day operation so we had to take a pass. It looks like
we may end up being the last ARTCC in the NAS to get URET, but they're gonna
have to send us some staffing or we'll *never* get it up and running.


My area has 8 sectors, but two sets are usually combined together
except during "ski country" when things get crazy-busy.
I work in the area that handles the mountain airports, like Aspen,
Eagle, Telluride, Montrose, Grand Junction, Steamboat Springs, etc.


8 sectors, cool. I can't wait to hear your opinion about URET and non-radar
operations. Love your strips, they are your friends. URET is merely
another scam in a parade of FAA contractor scams, IMO. "Conflict Probe!"
Just what the chic enroute controller needs (NOT!!!). Pass the pork,
please.


I'm not sure on the number of controllers, but I know we're considered
short staffed (any surprise there?). We just had to transfer in two
controllers from other areas to try to even things out. Initially
they were going to force two people who had previously been in our
area to come back, but they finally decided to take volunteers instead
(to everyone's relief).

We're also overloaded with trainees in the area. Right now we have 7
people that will be bidding R-side trainee lines (either radar
developmentals now, or people nearly done with their D-sides) and 4
that will be bidding D-side trainee lines.
I'm the only one left in the area that's A-side only, so I should be
next to train, whenever "next" comes up.
My side of the week is pretty good about getting training done, but
the other side keeps the devs on the positions they're already checked
out on and does very little training.


Well, you went to the right facility and Region. In my area we have a grand
total of 1
R-side developmental and five D-side developmentals, one of whom is a PATCO
re-hire who is not likely to ever get certified. He's 65 or so. Another is
an ex-USAF retired E-8 controller on the Phoenix-20 program who was probably
great at terminal op's and on the battlefield but thus far is over his head
here in Atlanta-land. However, I guess four out of six hopefuls is better
than nothing.

At least out there at ZDV you will probably get checked out in normal time
once you get started. Here, no matter what side of the week you train on,
dev's are constantly getting pulled out of training to provide watch
coverage. I've got D-side guys who have been at it for over a year and
still have half the sectors left to conquer. It's a real catch 22. We
don't have enough staffing to consistently train people, and we don't have
enough staffing because we can't get people trained. Sin loi!

Good luck out there!

Chip, ZTL





  #2  
Old December 2nd 03, 08:20 PM
Jill Kamienski
external usenet poster
 
Posts: n/a
Default

I can't wait to hear your opinion about URET and non-radar operations.

It sounds like at least initially we're going to keep strips in the
non-radar sectors. I guess eventually they'll go URET, but it will
take longer to implement.


The other fun thing about URET coming here is that they're saying
because the training department is "ahead of schedule", then my
training is not being delayed, therefore no back-pay. Whatever.


At least out there at ZDV you will probably get checked out in normal time
once you get started.


We'll see. It depends how much time they spend training. Training
pretty much stops during our "ski country" which is basically
December-March. It doesn't sound as bad as ZTL, but my area tends to
be slower to check people out than even all the other areas at ZDV,
and it's not due to devs using more hours, they still use the same,
but it's due to taking longer to get those hours (at least that's what
I've been told, including a threat to take me out of my area, which I
hope is a dead issue because I love my area).


We
don't have enough staffing to consistently train people, and we don't have
enough staffing because we can't get people trained.


Yep, sounds like here.
Fortunately we have one sup that is really into training, and whenever
he has the desk he finds a way to get training done, no matter what
manipulating he has to do. He can't do much else but he can get
training accomplished. That's why his side of the week does better
than the other.


Later,
Jill
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
62526 Mining the Web: Jacobian Matrix Constructs with eigenVectorSearching 62526 Web Science Home Built 0 November 16th 04 10:01 PM
20385 Mining the Web :Searches with Kriging, Inverse DistanceWeighting, eigenVectors and Cross-Pollination 20385 Web Science Owning 0 November 16th 04 10:01 PM
MiG-17 Still Missing After Nightlong Search - New Mexico Rusty B Military Aviation 0 March 26th 04 08:29 PM
List your website with the only Aviation related pay per click search engine!!! Justin Case General Aviation 0 August 2nd 03 12:02 PM
Vietnam search to continue to find remains of Waterford pilot Otis Willie Military Aviation 0 July 2nd 03 10:30 PM


All times are GMT +1. The time now is 03:40 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.