![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
![]()
"steve mew" wrote in message ...
Does anyone know where the specific FAA regulations are that govern supersonic flight ? ie Hypothetically if one wanted to fly across the continental US at post sonic speed how would you go about it ? Sec. 91.817 - Civil aircraft sonic boom. (a) No person may operate a civil aircraft in the United States at a true flight Mach number greater than 1 except in compliance with conditions and limitations in an authorization to exceed Mach 1 issued to the operator under appendix B of this part. (b) In addition, no person may operate a civil aircraft for which the maximum operating limit speed MM0 exceeds a Mach number of 1, to or from an airport in the United States, unless -- (1) Information available to the flight crew includes flight limitations that ensure that flights entering or leaving the United States will not cause a sonic boom to reach the surface within the United States; and (2) The operator complies with the flight limitations prescribed in paragraph (b)(1) of this section or complies with conditions and limitations in an authorization to exceed Mach 1 issued under appendix B of this part. Sec. 91.819 - Civil supersonic airplanes that do not comply with part 36. (a) Applicability. This section applies to civil supersonic airplanes that have not been shown to comply with the Stage 2 noise limits of part 36 in effect on October 13, 1977, using applicable trade-off provisions, and that are operated in the United States, after July 31, 1978. (b) Airport use. Except in an emergency, the following apply to each person who operates a civil supersonic airplane to or from an airport in the United States: (1) Regardless of whether a type design change approval is applied for under part 21 of this chapter, no person may land or take off an airplane covered by this section for which the type design is changed, after July 31, 1978, in a manner constituting an "acoustical change" under §21.93 unless the acoustical change requirements of part 36 are complied with. (2) No flight may be scheduled, or otherwise planned, for takeoff or landing after 10 p.m. and before 7 a.m. local time. Sec. 91.821 - Civil supersonic airplanes: Noise limits. Except for Concorde airplanes having flight time before January 1, 1980, no person may operate in the United States, a civil supersonic airplane that does not comply with Stage 2 noise limits of part 36 in effect on October 13, 1977, using applicable trade-off provisions. Appendix B to Part 91 - Authorizations to Exceed Mach 1 (§91.817) Section 1. Application (a) An applicant for an authorization to exceed Mach 1 must apply in a form and manner prescribed by the Administrator and must comply with this appendix. (b) In addition, each application for an authorization to exceed Mach 1 covered by section 2(a) of this appendix must contain all information requested by the Administrator necessary to assist him in determining whether the designation of a particular test area or issuance of a particular authorization is a "major Federal action significantly affecting the quality of the human environment" within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), and to assist him in complying with that act and with related Executive Orders, guidelines, and orders prior to such action. (c) In addition, each application for an authorization to exceed Mach 1 covered by section 2(a) of this appendix must contain -- (1) Information showing that operation at a speed greater than Mach 1 is necessary to accomplish one or more of the purposes specified in section 2(a) of this appendix, including a showing that the purpose of the test cannot be safely or properly accomplished by overocean testing; (2) A description of the test area proposed by the applicant, including an environmental analysis of that area meeting the requirements of paragraph (b) of this section; and (3) Conditions and limitations that will ensure that no measurable sonic boom overpressure will reach the surface outside of the designated test area. (d) An application is denied if the Administrator finds that such action is necessary to protect or enhance the environment. Section 2. Issuance (a) For a flight in a designated test area, an authorization to exceed Mach 1 may be issued when the Administrator has taken the environmental protective actions specified in section 1(b) of this appendix and the applicant shows one or more of the following: (1) The flight is necessary to show compliance with airworthiness requirements. (2) The flight is necessary to determine the sonic boom characteristics of the airplane or to establish means of reducing or eliminating the effects of sonic boom. (3) The flight is necessary to demonstrate the conditions and limitations under which speeds greater than a true flight Mach number of 1 will not cause a measurable sonic boom overpressure to reach the surface. (b) For a flight outside of a designated test area, an authorization to exceed Mach 1 may be issued if the applicant shows conservatively under paragraph (a)(3) of this section that -- (1) The flight will not cause a measurable sonic boom overpressure to reach the surface when the aircraft is operated under conditions and limitations demonstrated under paragraph (a)(3) of this section; and (2) Those conditions and limitations represent all foreseeable operating conditions. Section 3. Duration (a) An authorization to exceed Mach 1 is effective until it expires or is surrendered, or until it is suspended or terminated by the Administrator. Such an authorization may be amended or suspended by the Administrator at any time if the Administrator finds that such action is necessary to protect the environment. Within 30 days of notification of amendnent, the holder of the authorization must request reconsideration or the amendnent becomes final. Within 30 days of notification of suspension, the holder of the authorization must request reconsideration or the authorization is automatically terminated. If reconsideration is requested within the 30-day period, the amendment or suspension continues until the holder shows why the authorization should not be amended or terminated. Upon such showing, the Administrator may terminate or amend the authorization if the Administrator finds that such action is necessary to protect the environment, or he may reinstate the authorization without amendment if he finds that termination or amendnent is not necessary to protect the environment. (b) Findings and actions by the Administrator under this section do not affect any certificate issued under title VI of the Federal Aviation Act of 1958. |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
more radial fans like fw190? | jt | Military Aviation | 51 | August 28th 04 04:22 AM |
Landing and T/O distances (Was Cold War ALternate Basing) | Guy Alcala | Military Aviation | 3 | August 13th 04 12:18 PM |
Space Elevator | Big John | Home Built | 111 | July 21st 04 04:31 PM |
Overweight takeoff / flight | Koopas Ly | Piloting | 50 | December 3rd 03 11:53 PM |
New Film: The Need For Speed - Going to war on drugs | Phil Carpenter | Military Aviation | 0 | July 23rd 03 07:43 AM |