![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
![]()
FYI
New: Very Light Jets: Several Factors Could Influence Their Effect on the National Airspace System. GAO-07-1001. http://www.gao.gov/new.items/d071001.pdf Recent and older reports Aviation Finance: Observations on the Current FAA Funding Structure's Support for Aviation Activities, Issues Affecting Future Costs, and Proposed Funding Changes by Gerald L. Dillingham, director, physical infrastructure issues, before the Subcommittee on Select Revenue Measures, House Committee on Ways and Means. GAO-07-1163T, August 1. 2007 http://www.gao.gov/new.items/d071163t.pdf Federal Aviation Administration: Key Issues in Ensuring the Efficient Development and Safe Operation of the Next Generation Air Transportation System, by Gerald L. Dillingham, Director, Physical Infrastructure, before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure. GAO-07-636T, March 22. 2007 http://www.gao.gov/cgi-bin/getrpt?GAO-07-636T Next Generation Air Transportation System: Progress and Challenges in Planning and Implementing the Transformation of the National Airspace System, by Susan A. Fleming, Acting Director, Physical Infrastructure, before the Subcommittee on Aviation Operations, Safety, and Security, Senate Committee on Commerce, Science, and Transportation. GAO-07-649T, March 22. 2007 http://www.gao.gov/new.items/d07649t.pdf Next Generation Air Transportation System: Progress and Challenges Associated with the Transformation of the National Airspace System. GAO-07-25, November 13. 2006 http://www.gao.gov/new.items/d0725.pdf FAA's Proposed Plan for Implementing a Reliability Centered Maintenance Process for Air Traffic Control Equipment. GAO-07-81R, November 9. 2006 http://www.gao.gov/new.items/d0781r.pdf Commercial Space Launches: FAA Needs Continued Planning and Monitoring to Oversee the Safety of the Emerging Space Tourism Industry. GAO-07-16, October 20. 2006 http://www.gao.gov/new.items/d0716.pdf National Airspace System Modernization: Observations on Potential Funding Options for FAA and the Next Generation Airspace System, by Gerald L. Dillingham, Ph.D, director, physical infrastructure issues, before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure. GAO-06-1114T, September 27. 2006 http://www.gao.gov/new.items/d061114t.pdf Aviation Finance: Observations on Potential FAA Funding Options. GAO-06-973, September 29, 2006 http://www.gao.gov/new.items/d06973.pdf Next Generation Air Transportation System: Preliminary Analysis of Progress and Challenges Associated with the Transformation of the National Airspace System, by Gerald L. Dillingham, director, physical infrastructure, before the Subcommittee on Aviation, Senate Committee on Commerce, Science, and Transportation. GAO-06-915T, July 25. 2006 http://www.gao.gov/new.items/d06915t.pdf National Airspace System: Transformation will Require Cultural Change, Balanced Funding Priorities, and Use of All Available Management Tools. GAO-06-154, October 14. 2005 http://www.gao.gov/new.items/d06154.pdf Aviation Safety: System Safety Approach Needs Further Integration into FAA's Oversight of Airlines. GAO-05-726, September 28. 2005 http://www.gao.gov/new.items/d05726.pdf Air Traffic Control Operations: The Federal Aviation Administration Needs to Address Major Air Traffic Operating Cost Control Challenges. GAO-05-724, June 23. 2005 http://www.gao.gov/new.items/d05724.pdf National Airspace System: FAA Has Made Progress but Continues to Face Challenges in Acquiring Major Air Traffic Control Systems. GAO-05-331, June 10. 2005 http://www.gao.gov/new.items/d05331.pdf National Airspace System: Initiatives to Reduce Flight Delays and Enhance Capacity are Ongoing but Challenges Remain, by Gerald L. Dillingham, director, physical infrastructure issues, before the Subcommittee on Aviation, Senate Committee on Commerce, Science, and Transportation. GAO-05-755T, May 26. 2005 http://www.gao.gov/new.items/d05755t.pdf National Airspace System: Progress and Ongoing Challenges for the Air Traffic Organization, by Gerald L. Dillingham, director, physical infrastructure, before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure. GAO-05-485T, April 14. 2005 http://www.gao.gov/new.items/d05485t.pdf National Airspace System: Experts' Views on Improving the U.S. Air Traffic Control Modernization Program. GAO-05-333SP, April 2005. http://www.gao.gov/new.items/d05333sp.pdf Air Traffic Control: FAA's Acquisition Management Has Improved, but Policies and Oversight Need Strengthening to Help Ensure Results. GAO-05-23, November 12. 2004 http://www.gao.gov/new.items/d0523.pdf Air Traffic Control: FAA Needs to Ensure Better Coordination When Approving Air Traffic Control Systems. GAO-05-11, November 17. 2004 http://www.gao.gov/new.items/d0511.pdf Aviation Safety: FAA Needs to Strengthen the Management of Its Designee Program. GAO-05-40, October 8. 2004 http://www.gao.gov/new.items/d0540.pdf Air Traffic Control: FAA's Modernization Efforts-Past, Present, and Future, by Gerald L. Dillingham, director, physical infrastructure, before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure. GAO-04-227T, October 30. 2003 http://www.gao.gov/new.items/d04227t.pdf National Airspace System: Current Efforts and Proposed Changes to Improve Performance of FAA's Air Traffic Control System. GAO-03-542, May 30. 2003 http://www.gao.gov/new.items/d03542.pdf National Airspace System: Reauthorizing FAA Provides Opportunity and Options to Address Challenges, by Gerald L. Dillingham, director of physical infrastructure issues, before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure. GAO-03-473T, February 12. 2003 http://www.gao.gov/new.items/d03473t.pdf National Airspace System: Better Cost Data Could Improve FAA's Management of the Standard Terminal Automation Replacement System. GAO-03-343, January 31. 2003 http://www.gao.gov/new.items/d03343.pdf Mike |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
SMALL UAV OK'D FOR NATIONAL AIRSPACE | Larry Dighera | Piloting | 11 | June 25th 07 01:04 AM |
HM-53E MK-105 Magnetic Influence System 061106-N-5555T-001.jpg | [email protected] | Aviation Photos | 2 | November 13th 06 10:08 PM |
MH-53 MK-105 Magnetic Influence System 061106-N-5555T-010.jpg | [email protected] | Aviation Photos | 0 | November 11th 06 11:16 PM |
Speech: The Influence of Air Power Upon History National Archives | Otis Willie | Military Aviation | 0 | December 13th 03 08:41 PM |
Effect of Light Sport on General Aviation | Gilan | Home Built | 17 | September 24th 03 06:11 AM |