#1
|
|||
|
|||
![]()
What are your experiences with the time required to complete this AD?
The AD itself says two hours. Any tips or tricks? I'm not an AP but the one we use says it can take several hours w/alot of contortions invovled. |
#2
|
|||
|
|||
![]()
On 5 mai, 14:05, Mike wrote:
What are your experiences with the time required to complete this AD? The AD itself says two hours. Any tips or tricks? I'm not an AP but the one we use says it can take several hours w/alot of contortions invovled. We needed about halve a day for replacing the Control Bridge. We know our hardware wery well, we are good technician, we have the knwoledge "how to..". Of course we were not in a hurry but we still needed about halve a day. Cheers, Bruno |
#3
|
|||
|
|||
![]()
I think to do a proper job, you need to remove it from the aircraft.
I agree with two people, it is about a day. Trying to get a new bridge may not be easy, still waiting for a quote. If you have an L-23, I have heard a new bridge terminates the repetive inspection part of the AD. aerodyne |
#4
|
|||
|
|||
![]()
On 5 mai, 16:30, wrote:
I think to do a proper job, you need to remove it from the aircraft. I agree with two people, it is about a day. Trying to get a new bridge may not be easy, still waiting for a quote. *If you have an L-23, I have heard a new bridge terminates the repetive inspection part of the AD. aerodyne I had to buy a new one. It cost about 880 Euros. What I bought is just the "bridge" not the sticks associated to it. In cases of cracks the AD stated that the bridge has to be replaced. Replacement means that the old cracked bridge has to be removed. Removing the old bridge takes about 90 minutes. Installing a new one takes a little more because there are many little screws here and there... Bruno |
#5
|
|||
|
|||
![]()
How about just the dye inspection w/o having to replace the parts?
Still half a day? Thanks |
#6
|
|||
|
|||
![]()
Yes, at least half a day for two people, assuming you have not done it
before. Cause you wouldn't be asking otherwise, right? aerodyne |
#7
|
|||
|
|||
![]()
On 5 mai, 21:50, wrote:
Yes, at least half a day for two people, assuming you have not done it before. Cause you wouldn't be asking otherwise, right? aerodyne Doing inspection with dye takes 20 min. If there are cracks, you will see it immediately ! I was surprised to discover those cracks forcing me to replace the whole control bridge. Cheers, Bruno |
#8
|
|||
|
|||
![]() Doing inspection with dye takes 20 min. If there are cracks, you will see it immediately ! I was surprised to discover those cracks forcing me to replace the whole control bridge. Cheers, Bruno Don't assume the cracks will be that large to be easily seen espcially if you leave the bridge in. I have seen a case where the dye check was inconclusive, but the dye pen ran inside the tube right through the edge of the weld! This was only found when the part was on the bench in bright light, with a magnifier as called for in the AD. aerodyne |
#9
|
|||
|
|||
![]()
On 6 mai, 05:49, wrote:
Doing inspection with dye takes 20 min. If there are cracks, you will see it immediately ! I was surprised to discover those cracks forcing me to replace the whole control bridge. Cheers, Bruno Don't assume the cracks will be that large to be easily seen espcially if you leave the bridge in. *I have seen a case where the dye check was inconclusive, but the dye pen ran inside the tube right through the edge of the weld! * This was only found when the part was on the bench in bright light, with a magnifier as called for in the AD. * aerodyne Well....on my Blanik, cracks were huge ones.... so the conclusion was easy to take...unfortunately.... Bruno |
#10
|
|||
|
|||
![]()
So, y'all telling me that the Feds have grossly underestimated the
time (and therefore the cost) of completing the AD? Astonishing! Oh, well it is what it is. Anyone want to buy an-out-of annual L13?Thanks. Mike |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Blanik L-23 Super Blanik Manual -F.C.F.S. | Joel Flamenbaum | Soaring | 2 | April 14th 10 03:29 PM |
Blanik L-13 & TN L105 about inspection on control bridge | nimbus | Soaring | 3 | November 1st 09 07:53 AM |
Old pics - new scans 3 - Than Hoa bridge after LGB strike - note adjacent pontoon bridge | Dave Kearton | Aviation Photos | 0 | January 15th 08 09:47 PM |
You Want Control? You Can't Handle Control! -- Was 140 dead | ArtKramr | Military Aviation | 0 | March 2nd 04 08:48 PM |